Illinois Tollway I-17-4298

The project began in January of 2018 and has a projected duration of 2 years.  American First Contracting, Inc. will assist the (DSE) with the reconstruction and rehabilitation of the Central Tri-State Tollway (I-294) between the I-55 Ramps and Ogden Avenue; work that is anticipated to be constructed in eight construction packages.  The scope of … Continued

Illinois Tollway I-17-4683

Sub-consultant to Bollinger Lach and Associates providing construction inspection services on the Elgin O’Hare Western Access (EOWA) Extension from Route 83 to York Road.

Illinois Tollway I-17-4682

Sub-consultant to HLR on the IL Tollway system to provide Construction Inspection services on upon request.  Projects including landscaping and bridge construction on I-90.

Illinois Tollway I-17-4277

Sub-consultant to Wynndalco Engineering and Midwest Engineering to provide design and CAD services for the Edens Spur on I94/I294. Contract completed April 2018.

Illinois Tollway I-17-4314

Sub-consultant to HOH Associates to provide design and CAD services for the I294 for the 13 mile stretch of I294 from Balmoral to Lake Cook Road.  Contract to be completed in the Fall of 2018.

Illinois Tollway I-14-4636

Sub-consultant to Bollinger Lach and Associates on the Elgin O’Hare Western Access (EOWA) Extension from Park Blvd. to Arlington Heights Road.  Construction Inspection contract.  Contract completed in September 2016.